Decorative metalwork fails in two different ways: it can be made wrong, or it can be made right and then damaged. One final inspection catches the second, not the first.

Stage 1 — in-process, while correction is still possible
The first check happens on the workshop floor, when dimensions, hole positions and surface finish can still be adjusted.
- Dimensions against the approved drawing
- Hole positions and assembly fit
- PVD colour and coating condition
Stage 2 — pre-shipment, on what actually leaves
The second check is about the finished item and its packing, not the intent of the design.
- Assembly and surface under final lighting
- Part labels and quantity
- Protective wrapping and crate condition

Why the sequence matters
Finding a colour mismatch after crating means rework, delay and sometimes a missed shipping window. Finding it during production means a correction.
- Stage 1 catches problems while they are cheap to fix
- Stage 2 confirms what leaves the factory
- Records shared before dispatch
Frequently asked questions
Do we receive evidence of both stages?
Check records and workshop photos are shared before the goods leave China.
Can we add our own inspection criteria?
Yes. Project-specific criteria go into the check sheet alongside the general finish and handling standards.
Is the PVD finish checked for colour consistency?
Yes, at sample approval and again in-process, because plated colour is sensitive to batch and lighting conditions.
Related reading
Working on a fit-out or renovation project and sourcing custom materials from China?
Send us your drawing package — we will review it and come back with a sourcing and QC plan.
www.wrm.cn · info@wrm.cn · WhatsApp +86 18688280345