A catalogue is not a capability statement. Before a factory produces for a client project, we verify five things that a brochure cannot answer.

Capability and capacity
The first question is narrow: can this factory make THIS part at this tolerance, and is the lead time realistic for the programme?
- Comparable parts it has actually produced
- Equipment for the required folds and finishes
- Realistic capacity against your deadline
Samples and track record
A sample shows what the factory can do when it is being watched. Comparable past projects show what it does on a normal week.
- Physical sample checked before commitment
- Reference projects of similar scope
- Consistency across batches

Communication and documentation
Most rework is a translation failure, not a machining failure. We test whether drawings are understood before any material is cut.
- Clarification questions raised in writing
- Change confirmations recorded
- One named technical contact
Frequently asked questions
Do you audit factories on site?
Verification includes on-site checks where the project warrants it, alongside document and sample review. The depth depends on part complexity and risk.
Can we use a factory we already know?
Yes. We can work with an existing supplier and still apply the same incoming checks and production follow-up.
What happens if a factory fails verification?
It is not used for that scope. We shortlist alternatives rather than lowering the specification.
Working on a fit-out or renovation project and sourcing custom materials from China?
Send us your drawing package — we will review it and come back with a sourcing and QC plan.